Gutter Service Pro Free call(866) 228-6229

York County, South Carolina

Gutter cleaning, repair and new gutters in Baxter Village, SC

A normal year in Baxter Village brings about 46 inches of rain; on roughly 14 of its days, an inch or more comes down at once. The wettest season is summer (June to August), with about 12.4 inches; the driest is fall (September to November), with 10.6. That is about 28,200 gallons a year off each 1,000 square feet of roof, every drop of it through a gutter and a downspout.

Call (866) 228-6229 free call to a gutter contractor serving Baxter Village

Baxter Village: rain and roofs

NOAA station USC00383216, 2 mi
45.5 in
Rain in a normal year, Baxter Village
NOAA normal, FT MILL 4 NW
13.9
Days with an inch or more
a year
28,200 gal
Water off 1,000 sq ft of roof in Baxter Village
0.62 gal per sq ft per inch
7.50 in/hr
5-minute downpour, once in 10 years
NOAA Atlas 14 Volume 2
Nov 4
First fall frost
median date
2006
Median year homes were built
ACS 2020–2024
2%
Homes built before 1980
ACS 2020–2024
Winter11.2 in
Spring11.3 in
Summer12.4 in
Fall10.6 in

Bars to one scale; the longest is summer (June to August).

Counting days with an inch of rain or more, Baxter Village sits near the middle of the 266 places in South Carolina on this site (13.9 a year). Its housing ranks among the newest by median year built of the 265 places in South Carolina on this site (half built by 2006). By first frost it falls 54th earliest for the first fall frost of the 263 places in South Carolina on this site (November 4).

When to clean gutters in Baxter Village

The first fall frost comes around November 4 in a typical year here, and the last spring frost around March 31 (median dates, NOAA normals). Booking the fall cleaning after the first frost, once the trees over the roof are bare, catches the season’s drop in one visit; the spring cleaning comes after the pollen and catkins are down.

When to clean gutters explains how the trees over a roof change the schedule.

Gutter and downspout size for Baxter Village rain

The short, hard downpour is what a gutter is sized for. In Baxter Village the five-minute rain expected about once in ten years falls at 7.50 inches an hour (NOAA Atlas 14 Volume 2). At that rate one 2-by-3-inch downspout drains about 960 square feet of roof and one 3-by-4-inch downspout about 1,920, by the rule in the Copper Development Association’s design handbook. Try your own roof in the gutter and downspout calculator, which starts from this figure.

The houses in Baxter Village

Half the homes in Baxter Village were built by 2006, 2% before 1980 (ACS 2020–2024). Most houses here are young enough to have their first gutters, so cleanings, guards and small leaks come up more than replacements.

92% of households own their home, and 92% of homes are detached houses, 5% townhouses. If an association maintains the exterior, the gutters may be its job rather than yours; check before calling.

Hiring in South Carolina

South Carolina has no license category for gutters. The Residential Builders Commission registers specialty trades for work over $500, and gutters are not among them; under the statute, repair or improvement of a home costing more than $5,000 is residential builder work. For a large job, ask what license the contractor holds and look it up; for any job, ask for proof of insurance.

Source: S.C. Code, Title 40 Chapter 59. Look-up: S.C. LLR, licensee lookup.

Gutter work in Baxter Village

In a neighborhood with half its homes built by 2006, the usual calls are cleaning, guards and small repairs. The line takes all of it:

Nearby

Call (866) 228-6229 free call