Gutter Service Pro Free call(866) 228-6229

Marin County, California

Gutter cleaning, repair and new gutters in Belvedere, CA

Rain in Belvedere adds up to about 36 inches in a normal year, with about 12 days that bring an inch or more. The wettest season is winter (December to February), with about 21.3 inches; the driest is summer (June to August), with 0.6. Every 1,000 square feet of roof sheds about 22,500 gallons a year, and all of it goes through the gutters.

Call (866) 228-6229 free call to a gutter contractor serving Belvedere

Belvedere: rain and roofs

NOAA station USC00046027, 6 mi
36.2 in
Rain in a normal year, Belvedere
NOAA normal, MUIR WOODS
11.5
Days with an inch or more
a year
22,500 gal
Water off 1,000 sq ft of roof in Belvedere
0.62 gal per sq ft per inch
3.55 in/hr
5-minute downpour, once in 10 years
NOAA Atlas 14 Volume 6
1959
Median year homes were built
ACS 2020–2024
87%
Homes built before 1980
ACS 2020–2024
Winter21.3 in
Spring8.2 in
Summer0.6 in
Fall6.1 in

Bars to one scale; the longest is winter (December to February).

For days with an inch of rain or more, Belvedere ranks 79th for heavy-rain days of the 939 places in California on this site (11.5 a year). Its housing ranks 112th oldest by median year built of the 938 places in California on this site (half built by 1959).

When to clean gutters in Belvedere

Frost is rare in Belvedere, and in many years there is none (NOAA normals). With no hard freeze to strip the trees, the fall cleaning follows the leaf drop itself; book it once the trees over the roof are bare, and plan a second visit in spring.

When to clean gutters explains how the trees over a roof change the schedule.

Gutter and downspout size for Belvedere rain

What overwhelms a gutter is a burst, not a season. In Belvedere the five-minute rain expected about once in ten years falls at 3.55 inches an hour (NOAA Atlas 14 Volume 6). At that rate one 2-by-3-inch downspout drains about 2,030 square feet of roof and one 3-by-4-inch downspout about 4,060, by the rule in the Copper Development Association’s design handbook. Try your own roof in the gutter and downspout calculator, which starts from this figure.

The houses in Belvedere

Half the homes in Belvedere were built by 1959, 87% before 1980 (ACS 2020–2024). In a neighborhood that age, many houses are on their second set of gutters or due for one, and the fascia board behind them is worth checking at the same visit. On a house built before 1978, replacing more than 20 square feet of painted fascia or trim falls under the EPA’s lead-safe rule, so ask whether the crew is certified.

72% of households own their home, and 86% of homes are detached houses, 3% townhouses. In a townhouse or HOA community, check who owns the gutters and what colors are allowed before booking.

Hiring in California

Ask any contractor working in Belvedere what California requires of them for gutter work, and to show proof of insurance. Hiring a gutter contractor

In California’s fire hazard severity zones, the 2025 Wildland-Urban Interface Code (in force January 1, 2026) requires gutters and downspouts of noncombustible material, and gutters fitted with an approved means to keep leaves and debris from collecting (section 504.4). (2025 California Wildland-Urban Interface Code, Chapter 5 (UpCodes))

Gutter work in Belvedere

With half the homes built by 1959, replacement gutters and the fascia behind them come up more often here than in newer suburbs. The line takes all of it:

Nearby

Call (866) 228-6229 free call