Gutter Service Pro Free call(866) 228-6229

Putnam County, West Virginia

Gutter cleaning, repair and new gutters in Eleanor, WV

Rain in Eleanor adds up to about 39 inches in a normal year, with about 8 days that bring an inch or more. The wettest season is summer (June to August), with about 11.6 inches; the driest is fall (September to November), with 8.2. That is about 24,500 gallons a year off each 1,000 square feet of roof, every drop of it through a gutter and a downspout.

Call (866) 228-6229 free call to a gutter contractor serving Eleanor

Eleanor: rain and roofs

NOAA station USC00469683, 1 mi
39.5 in
Rain in a normal year, Eleanor
NOAA normal, WINFIELD LOCKS
8.4
Days with an inch or more
a year
24,500 gal
Water off 1,000 sq ft of roof in Eleanor
0.62 gal per sq ft per inch
6.56 in/hr
5-minute downpour, once in 10 years
NOAA Atlas 14 Volume 2
Oct 30
First fall frost
median date
1979
Median year homes were built
ACS 2020–2024
51%
Homes built before 1980
ACS 2020–2024
Winter8.8 in
Spring10.9 in
Summer11.6 in
Fall8.2 in

Bars to one scale; the longest is summer (June to August).

Counting days with an inch of rain or more, Eleanor sits near the middle of the 147 places in West Virginia on this site (8.4 a year). Its housing ranks among the newest by median year built of the 147 places in West Virginia on this site (half built by 1979). By first frost it falls among the latest for the first fall frost of the 147 places in West Virginia on this site (October 30).

When to clean gutters in Eleanor

The first fall frost comes around October 30 in a typical year here, and the last spring frost around April 18 (median dates, NOAA normals). Booking the fall cleaning after the first frost, once the trees over the roof are bare, catches the season’s drop in one visit; the spring cleaning comes after the pollen and catkins are down.

When to clean gutters explains how the trees over a roof change the schedule.

Gutter and downspout size for Eleanor rain

The short, hard downpour is what a gutter is sized for. In Eleanor the five-minute rain expected about once in ten years falls at 6.56 inches an hour (NOAA Atlas 14 Volume 2). At that rate one 2-by-3-inch downspout drains about 1,100 square feet of roof and one 3-by-4-inch downspout about 2,200, by the rule in the Copper Development Association’s design handbook. Try your own roof in the gutter and downspout calculator, which starts from this figure.

The houses in Eleanor

Half the homes in Eleanor were built by 1979, 51% before 1980 (ACS 2020–2024). Houses that age have often had their gutters replaced once already; if not, the original runs and the boards behind them deserve a close look. On a house built before 1978, replacing more than 20 square feet of painted fascia or trim falls under the EPA’s lead-safe rule, so ask whether the crew is certified.

77% of households own their home, and 86% of homes are detached houses, 2% townhouses. If an association maintains the exterior, the gutters may be its job rather than yours; check before calling.

Hiring in West Virginia

Licensing for gutter work differs from state to state; ask a contractor in Eleanor which license or registration they hold in West Virginia, and for proof of liability insurance. Hiring a gutter contractor

Gutter work in Eleanor

With half the homes built by 1979, replacement gutters and the fascia behind them come up more often here than in newer suburbs. The line takes all of it:

Nearby

Call (866) 228-6229 free call