Gutter Service Pro Free call(866) 228-6229

Taney County, Missouri

Gutter cleaning, repair and new gutters in Hollister, MO

Rain in Hollister adds up to about 46 inches in a normal year, with about 14 days that bring an inch or more. The wettest season is spring (March to May), with about 14.3 inches; the driest is winter (December to February), with 8.0. That is about 28,300 gallons a year off each 1,000 square feet of roof, every drop of it through a gutter and a downspout.

Call (866) 228-6229 free call to a gutter contractor serving Hollister

Hollister: rain and roofs

NOAA station USC00236460, 8 mi
45.7 in
Rain in a normal year, Hollister
NOAA normal, OZARK BEACH
13.9
Days with an inch or more
a year
28,300 gal
Water off 1,000 sq ft of roof in Hollister
0.62 gal per sq ft per inch
7.25 in/hr
5-minute downpour, once in 10 years
NOAA Atlas 14 Volume 8
Nov 2
First fall frost
median date
1989
Median year homes were built
ACS 2020–2024
29%
Homes built before 1980
ACS 2020–2024
Winter8.0 in
Spring14.3 in
Summer11.6 in
Fall11.8 in

Bars to one scale; the longest is spring (March to May).

Counting days with an inch of rain or more, Hollister sits 26th for heavy-rain days of the 361 places in Missouri on this site (13.9 a year). Its housing ranks among the newest by median year built of the 361 places in Missouri on this site (half built by 1989). By its first fall frost it sits among the latest for the first fall frost of the 361 places in Missouri on this site (November 2).

When to clean gutters in Hollister

The first fall frost comes around November 2 in a typical year here, and the last spring frost around April 8 (median dates, NOAA normals). Booking the fall cleaning after the first frost, once the trees over the roof are bare, catches the season’s drop in one visit; the spring cleaning comes after the pollen and catkins are down.

When to clean gutters explains how the trees over a roof change the schedule.

Gutter and downspout size for Hollister rain

What overwhelms a gutter is a burst, not a season. In Hollister the five-minute rain expected about once in ten years falls at 7.25 inches an hour (NOAA Atlas 14 Volume 8). At that rate one 2-by-3-inch downspout drains about 990 square feet of roof and one 3-by-4-inch downspout about 1,990, by the rule in the Copper Development Association’s design handbook. Try your own roof in the gutter and downspout calculator, which starts from this figure.

The houses in Hollister

Half the homes in Hollister were built by 1989, 29% before 1980 (ACS 2020–2024). In a neighborhood that age, many houses are on their second set of gutters or due for one, and the fascia board behind them is worth checking at the same visit.

65% of households own their home, and 57% of homes are detached houses. In a townhouse or HOA community, check who owns the gutters and what colors are allowed before booking.

Hiring in Missouri

Ask any contractor working in Hollister what Missouri requires of them for gutter work, and to show proof of insurance. Hiring a gutter contractor

Gutter work in Hollister

In a neighborhood with half its homes built by 1989, the usual calls are cleaning, guards and small repairs. The line takes all of it:

Nearby

Call (866) 228-6229 free call