Gutter Service Pro Free call(866) 228-6229

Cabarrus County, North Carolina

Gutter cleaning, repair and new gutters in Mount Pleasant, NC

Mount Pleasant gets about 48 inches of rain in a normal year, and on about 14 days a year an inch or more falls in a single day. The wettest season is summer (June to August), with about 14.5 inches; the driest is winter (December to February), with 10.3. Every 1,000 square feet of roof sheds about 29,700 gallons a year, and all of it goes through the gutters.

Call (866) 228-6229 free call to a gutter contractor serving Mount Pleasant

Mount Pleasant: rain and roofs

NOAA station USC00311975, 9 mi
47.9 in
Rain in a normal year, Mount Pleasant
NOAA normal, CONCORD
13.7
Days with an inch or more
a year
29,700 gal
Water off 1,000 sq ft of roof in Mount Pleasant
0.62 gal per sq ft per inch
7.28 in/hr
5-minute downpour, once in 10 years
NOAA Atlas 14 Volume 2
Nov 2
First fall frost
median date
1984
Median year homes were built
ACS 2020–2024
47%
Homes built before 1980
ACS 2020–2024
Winter10.3 in
Spring11.8 in
Summer14.5 in
Fall11.2 in

Bars to one scale; the longest is summer (June to August).

For days with an inch of rain or more, Mount Pleasant ranks near the middle of the 457 places in North Carolina on this site (13.7 a year). By the age of its homes it sits near the middle of the 457 places in North Carolina on this site (half built by 1984). The first frost here ranks near the middle of the 456 places in North Carolina on this site (November 2).

When to clean gutters in Mount Pleasant

The first fall frost comes around November 2 in a typical year here, and the last spring frost around April 1 (median dates, NOAA normals). Plan the fall visit for after the frost, when the trees over the roof have finished dropping, and the spring visit for after the pollen and catkins.

When to clean gutters explains how the trees over a roof change the schedule.

Gutter and downspout size for Mount Pleasant rain

What overwhelms a gutter is a burst, not a season. In Mount Pleasant the five-minute rain expected about once in ten years falls at 7.28 inches an hour (NOAA Atlas 14 Volume 2). At that rate one 2-by-3-inch downspout drains about 990 square feet of roof and one 3-by-4-inch downspout about 1,980, by the rule in the Copper Development Association’s design handbook. Try your own roof in the gutter and downspout calculator, which starts from this figure.

The houses in Mount Pleasant

Half the homes in Mount Pleasant were built by 1984, 47% before 1980 (ACS 2020–2024). In a neighborhood that age, many houses are on their second set of gutters or due for one, and the fascia board behind them is worth checking at the same visit. On a house built before 1978, replacing more than 20 square feet of painted fascia or trim falls under the EPA’s lead-safe rule, so ask whether the crew is certified.

78% of households own their home, and 72% of homes are detached houses, 2% townhouses. Where an HOA governs the exterior, its rules on gutter color and style apply before any order is placed.

Hiring in North Carolina

North Carolina licenses general contractors for projects of $40,000 or more (G.S. 87-1). An ordinary gutter job falls well below that, so no state license is required for it. Ask for proof of liability insurance and a written quote; for a larger project, look the company up with the licensing board.

Source: N.C. General Statutes § 87-1. Look-up: NC Licensing Board for General Contractors, license search.

Gutter work in Mount Pleasant

With half the homes built by 1984, replacement gutters and the fascia behind them come up more often here than in newer suburbs. The line takes all of it:

Nearby

Call (866) 228-6229 free call