Gutter Service Pro Free call(866) 228-6229

Sampson County, North Carolina

Gutter cleaning, repair and new gutters in Roseboro, NC

A normal year in Roseboro brings about 51 inches of rain; on roughly 14 of its days, an inch or more comes down at once. The wettest season is summer (June to August), with about 16.5 inches; the driest is winter (December to February), with 10.1. That is about 31,600 gallons a year off each 1,000 square feet of roof, every drop of it through a gutter and a downspout.

Call (866) 228-6229 free call to a gutter contractor serving Roseboro

Roseboro: rain and roofs

NOAA station USC00311881, 14 mi
51.0 in
Rain in a normal year, Roseboro
NOAA normal, CLINTON 2 NE
14.0
Days with an inch or more
a year
31,600 gal
Water off 1,000 sq ft of roof in Roseboro
0.62 gal per sq ft per inch
8.16 in/hr
5-minute downpour, once in 10 years
NOAA Atlas 14 Volume 2
Nov 7
First fall frost
median date
1970
Median year homes were built
ACS 2020–2024
59%
Homes built before 1980
ACS 2020–2024
Winter10.1 in
Spring11.1 in
Summer16.5 in
Fall13.3 in

Bars to one scale; the longest is summer (June to August).

Counting days with an inch of rain or more, Roseboro sits near the middle of the 457 places in North Carolina on this site (14.0 a year). Its housing ranks 60th oldest by median year built of the 457 places in North Carolina on this site (half built by 1970). By first frost it falls near the middle of the 456 places in North Carolina on this site (November 7).

When to clean gutters in Roseboro

The first fall frost comes around November 7 in a typical year here, and the last spring frost around March 26 (median dates, NOAA normals). Booking the fall cleaning after the first frost, once the trees over the roof are bare, catches the season’s drop in one visit; the spring cleaning comes after the pollen and catkins are down.

When to clean gutters explains how the trees over a roof change the schedule.

Gutter and downspout size for Roseboro rain

The short, hard downpour is what a gutter is sized for. In Roseboro the five-minute rain expected about once in ten years falls at 8.16 inches an hour (NOAA Atlas 14 Volume 2). At that rate one 2-by-3-inch downspout drains about 880 square feet of roof and one 3-by-4-inch downspout about 1,760, by the rule in the Copper Development Association’s design handbook. Try your own roof in the gutter and downspout calculator, which starts from this figure.

The houses in Roseboro

Half the homes in Roseboro were built by 1970, 59% before 1980 (ACS 2020–2024). Houses that age have often had their gutters replaced once already; if not, the original runs and the boards behind them deserve a close look. On a house built before 1978, replacing more than 20 square feet of painted fascia or trim falls under the EPA’s lead-safe rule, so ask whether the crew is certified.

57% of households own their home, and 70% of homes are detached houses, 6% townhouses. If an association maintains the exterior, the gutters may be its job rather than yours; check before calling.

Hiring in North Carolina

North Carolina licenses general contractors for projects of $40,000 or more (G.S. 87-1). An ordinary gutter job falls well below that, so no state license is required for it. Ask for proof of liability insurance and a written quote; for a larger project, look the company up with the licensing board.

Source: N.C. General Statutes § 87-1. Look-up: NC Licensing Board for General Contractors, license search.

Gutter work in Roseboro

With half the homes built by 1970, replacement gutters and the fascia behind them come up more often here than in newer suburbs. The line takes all of it:

Nearby

Call (866) 228-6229 free call