Washington County, Idaho
Gutter cleaning, repair and new gutters in Weiser, ID
Weiser gets about 13 inches of rain in a normal year, and a day with an inch or more comes once every 3 years or so. The wettest season is winter (December to February), with about 5.7 inches. Off a 1,000-square-foot roof that is about 8,300 gallons a year, most of it in steady rain rather than downpours.
Call (866) 228-6229 free call to a gutter contractor serving WeiserWeiser: rain and roofs
NOAA station USC00109638, 1 miBars to one scale; the longest is winter (December to February).
By heavy-rain days, Weiser falls near the middle of the 90 places in Idaho on this site (0.4 a year). By the age of its homes it sits 18th oldest by median year built of the 90 places in Idaho on this site (half built by 1971). The first frost here ranks near the middle of the 90 places in Idaho on this site (October 13).
When to clean gutters in Weiser
The first fall frost comes around October 13 in a typical year here, and the last spring frost around April 23 (median dates, NOAA normals). Plan the fall visit for after the frost, when the trees over the roof have finished dropping, and the spring visit for after the pollen and catkins.
When to clean gutters explains how the trees over a roof change the schedule.
Gutter and downspout size for Weiser rain
Gutters are sized for the worst few minutes of a storm, not for the year. In Weiser the five-minute rain expected about once in ten years falls at 2.94 inches an hour (NOAA Atlas 14 Volume 12). At that rate one 2-by-3-inch downspout drains about 2,450 square feet of roof and one 3-by-4-inch downspout about 4,900, by the rule in the Copper Development Association’s design handbook. Try your own roof in the gutter and downspout calculator, which starts from this figure.
Weiser is dry by national standards, about 13 inches in a normal year, but much of the rain that does come can arrive in short, hard storms: the five-minute downpour expected once in ten years still runs at 2.94 inches an hour. Where gutters are used here, the job is moving that burst away from the foundation, and keeping a dry season’s dust and debris from blocking the first storm.
The houses in Weiser
Half the homes in Weiser were built by 1971, 64% before 1980 (ACS 2020–2024). At that age a gutter has seen decades of leaves and storms, and the fascia it hangs from has too. On a house built before 1978, replacing more than 20 square feet of painted fascia or trim falls under the EPA’s lead-safe rule, so ask whether the crew is certified.
62% of households own their home, and 64% of homes are detached houses, 6% townhouses. Where an HOA governs the exterior, its rules on gutter color and style apply before any order is placed.
Hiring in Idaho
Before hiring in Weiser, ask which Idaho license or registration the contractor holds and for a certificate of liability insurance. Hiring a gutter contractor
Gutter work in Weiser
With half the homes built by 1971, replacement gutters and the fascia behind them come up more often here than in newer suburbs. The line takes all of it: