Gutter Service Pro Free call(866) 228-6229

Baltimore County, Maryland

Gutter cleaning, repair and new gutters in Arbutus, MD

Rain in Arbutus adds up to about 44 inches in a normal year, with about 11 days that bring an inch or more. The wettest season is summer (June to August), with about 12.4 inches; the driest is winter (December to February), with 9.5. Off a 1,000-square-foot roof, that comes to about 27,100 gallons a year for the gutters to carry.

Call (866) 228-6229 free call to a gutter contractor serving Arbutus

Arbutus: rain and roofs

NOAA station USW00093784, 5 mi
43.7 in
Rain in a normal year, Arbutus
NOAA normal, MD SCI CTR BALTIMORE
11.1
Days with an inch or more
a year
27,100 gal
Water off 1,000 sq ft of roof in Arbutus
0.62 gal per sq ft per inch
6.54 in/hr
5-minute downpour, once in 10 years
NOAA Atlas 14 Volume 2
Nov 21
First fall frost
median date
1956
Median year homes were built
ACS 2020–2024
81%
Homes built before 1980
ACS 2020–2024
Winter9.5 in
Spring10.9 in
Summer12.4 in
Fall11.0 in

Bars to one scale; the longest is summer (June to August).

By heavy-rain days, Arbutus falls near the middle of the 329 places in Maryland on this site (11.1 a year). By the age of its homes it sits 25th oldest by median year built of the 329 places in Maryland on this site (half built by 1956). By first frost it falls among the latest for the first fall frost of the 329 places in Maryland on this site (November 21).

When to clean gutters in Arbutus

The first fall frost comes around November 21 in a typical year here, and the last spring frost around March 24 (median dates, NOAA normals). A fall cleaning set for the weeks after that frost, when the branches over the house are bare, gets the year’s leaves in one trip; a spring visit follows once the pollen and catkins have come down.

When to clean gutters explains how the trees over a roof change the schedule.

Gutter and downspout size for Arbutus rain

The short, hard downpour is what a gutter is sized for. In Arbutus the five-minute rain expected about once in ten years falls at 6.54 inches an hour (NOAA Atlas 14 Volume 2). At that rate one 2-by-3-inch downspout drains about 1,100 square feet of roof and one 3-by-4-inch downspout about 2,200, by the rule in the Copper Development Association’s design handbook. Try your own roof in the gutter and downspout calculator, which starts from this figure.

The houses in Arbutus

Half the homes in Arbutus were built by 1956, 81% before 1980 (ACS 2020–2024). Houses that age have often had their gutters replaced once already; if not, the original runs and the boards behind them deserve a close look. On a house built before 1978, replacing more than 20 square feet of painted fascia or trim falls under the EPA’s lead-safe rule, so ask whether the crew is certified.

72% of households own their home, and 52% of homes are detached houses, 30% townhouses. If an association maintains the exterior, the gutters may be its job rather than yours; check before calling.

Hiring in Maryland

Maryland requires a Maryland Home Improvement Commission license for home improvement work of any amount, gutters included, and a contractor may not take a deposit of more than one third of the contract price (Business Regulation § 8-617). Look the license up before signing, and keep the deposit to one third or less.

Source: Maryland Business Regulation § 8-101. Look-up: Maryland Home Improvement Commission, public query.

Gutter work in Arbutus

With half the homes built by 1956, replacement gutters and the fascia behind them come up more often here than in newer suburbs. The line takes all of it:

Nearby

Call (866) 228-6229 free call